‘In a market already constrained by labor and scarred by fire, even if we could keep building the same way,
we would get the same results.
Traditional homes take too long to build—and too little to burn.
We need a faster, safer, and more resilient path forward.’ 
– 4C Team    

our product
+
Exceptional insulation properties
%
Avg. cost savings / sq ft
%
Avg. kgCO₂ / sq ft reduction
days
Average on-site assembly
Process

Our Work flow

Budgetary Quote

We will work with any existing or new building design, “translate” it into our system, and provide a detailed quote. 

Design Development

The 4C team will collaborate with all other design disciplines to develop a full digital twin for each project.

Construction Documents

A full set of construction documents would be generated using the final model and then submitted for permits.

Procurement & Production

4C will begin procurement and production after permit submittal, and in accordance with the project’s overall timeline.

On-Site Assembly

The 4C team will provide on-site assembly assistance and training for all supplied kit components upon delivery.

Support & Warranty

All our components come with an industry-leading 10-year warranty and on-site support.